Sunday, May 27, 2012

Week 4: Excavations

Markings on the front lawn to show there are no utilities in front.  Aside from that, you'd never know anything was happening at the house.


The beginning of excavation: the big "digger" is inside the yard; the little one in front of the garage


The yard pavers were neatly stacked by the garage.  Portions of the back fence can be seen propped against the pavers and lying on the ground in front of them.  The transplanted lilac is on the right.


The excavator dug a hole 20' long, 20' wide and 81/2' deep, upon which will rest the new basement, dining room, master bedroom, and three-story elevator.  Roughly 126 yards of earth were removed.

The dirt and other debris were deposited into the dump truck and hauled away.


One of nine hand-dug excavations for new footings that will support posts holding up the new second story of the house.  These new footings are required because our existing 1925 foundation has no footings!!

The orange markings show two other hand-dug footings, located deep in the crawl space and therefore the most difficult to excavate.


another of the nine footings


Dirt removed from the hand-dug footings was stockpiled in this basement space--we estimate the total accumulation to be around 15 yards.


1925 beer bottles that were found buried in the crawl space dirt


The end wall of this basement room had to come down.  It was removed in two sections, first by using a cement saw and then having the excavator pull the loosened section away.  It was fascinating to watch the excavator pull away the wall in about 2 minutes.  It would have probably taken a couple of hours to remove the wall manually.


preparing to remove the first half of the wall


first section of the wall--gone

Justin sawing the second half of the existing wall



preparing to remove the second section of wall


It's gone just like that!




The wall now is entirely gone.  Our contractor was nervous about how stable the remaining structure would be and decided to add reinforcement, which you'll see in later photos.

Justin and Dave Ghan began shoveling the 15 yards of footing dirt out the opening into the open excavation.  The excavator had a suggestion for expediting this process.  See next few photos.

Small excavot to the rescue. The skill level of Ron, the excavator, was extraordinary.


Ron reached into the storage space and pulled the 15 yards of dirt out, with Justin and Dave feeding the dirt into the excavator bucket.


dirt virtually gone from the basement in about 20 minutes


sweeping out the residue


finishing the hole--clean as a whistle


gravel placed into the hole


One part of the temporary reinforcement of the basement space is the plywood shear wall shown in this photo.  The shear wall is bolted both to the remaining wall and the basement slab.

Another part ofr the temporary reinforcement is this steel brace.


entryway cut between the kitchen and pantry/playroom


The chimney has been removed down to the level of the mantel.  The resulting opening between the living room and kitchen will become a framed wall on the living room side and cabinetry on the kitchen side.

Susan, Maya, Zoe, and Eddy survey the progress.

"It sure looks different", says Maya.


Yeah....right!


This wood and re-bar for the concrete forms has arrived. 

Steve Gregory, the concrete guy, arrived with his crew of four--two journeyman helpers and two golden retrievers.


It's important to have canine supervision.

Here is what things look like at the end of the week.

Sunday, May 20, 2012

Remodel Week 3

surveying the scene--the temporary electrical service has been connected.

Justin works on demolition of mudroom siding..

The siding contains lead, so it has to be carefully removed and wrapped.

The garage is full of the stuff we plan to reuse.

Demolition continues.  The weather has been warm and sunny all week.  If only that holds true when the roof comes off.

Nothing left of the mud room except some studs and the floor.


no kitchen walls left--and no window either

This was May 15, and Sandy's on the phone wishing Tessa happy birthday.

deck railing gone and stored in the garage and much of siding removed

The beginning of footing excavations in the basement:  We were hoping to find existing footings down here that would support the new second floor.  No such luck.

The chimney is gone with plywood temporarily patching the roof.  The asbestos people are here to remove the kitchen floor (their chute is visible sticking through the window on the left.  This photo and the remaining photos were organized by Susan, with our thanks, while we were in Berkeley.

The kitchen floor has asbestor in it and must be removed by an authorized asbestos removal company.  Here the kitchen has been cordoned off.  Three days afrter the asbestos is removed the air quality will be tested.  If rendered "safe", we're allowed back in.

It wasn't safe to take the pictures ourselves, so the asbestos removal expert very kindly took these interior pictures for our blog.


the last remnants of the kitchen floor, carefully wrapped

A goldfinch seems undisturbed by all the activity.

Superintendents Zoe and Maya make sure everything is going smoothly.  The back fence has been removed allowing them a clear view of the proceedings..